CrackitToday App

Baglihar Hydropower Project

Baglihar Hydropower Project:

Operations were suspended at the 450MW stage 1 Baglihar hydropower project on the Chenab river in Jammu and Kashmir after it got flooded recently.

  • It is a 900 MW run-of-the-river power project on the Chenab River in the Ramban district of Jammu and Kashmir.
  • It consists of a concrete gravity dam.
  • The project consists of two stages of 450 MW each.
  • Chenab River is the largest of the five tributaries of the Indus River.
  • It is formed by the confluence of two streams, Chandra and Bhaga, in the Lahaul and Spiti Districts of Himachal Pradesh.
  • In its upper reaches, it is also known as the Chandrabhaga.
  • It flows through the Jammu and Kashmir union territory, Himachal Pradesh, and after receiving the Jhelum River near Trimmu, the Chenab empties into the Sutlej River.
  • The Chenab valley is a structural trough formed by the great Himalayan and Pir Panjal ranges.
  • Major Tributaries:
    • Left Bank: Niru, Tawi, Neeru, and Liddrari.
    • Right Bank: Ans, Bhut Nalla, Bichleri, Kalnai Marusudar, and Miyar Nalla.
    • Major Dams on Chenab River: Salal (rockfill dam), Aalal (concrete dam), Baglihar, and Dul.