Ratle Hydro Electric Project:
The government recently announced diversion of Chenab river water through diversion tunnels to expedite the 850-MW Ratle Hydro Electric Project in Jammu & Kashmir
- Ratle Hydro Electric Project is an 850 MW run-of-river hydroelectric power project being built on the Chenab River in the Kishtwar District of Jammu and Kashmir.
- The project is being developed by Ratle Hydroelectric Power Corporation (RHPCL), which was formed as a joint venture (JV) between Jammu & Kashmir State Power Development Corporation (JKSPDC) and India’s state-owned National Hydroelectric Power Corporation (NHPC).
- The project comprises a 133-metre-tall and 194.8-meter-long concrete gravity dam, a diversion dam, and an underground powerhouse on the right bank of the river.
Chenab River:
- It is a major river of India and Pakistan.
- It is formed by the confluence of two streams, Chandra and Bhaga, at Tandi in the upper Himalayas in the Lahaul and Spiti Districts of Himachal Pradesh.
- In its upper reaches, it is also known as the Chandrabhaga.
- It is a tributary of the Indus River.